References

Excellent references

The tables below list reference projects in which the following AESTUVER fire-protection products have been installed in underground transport systems:

  • AESTUVER fire-protection board
  • AESTUVER T fire-protection board
  • AESTUVER D+2 fire-protection board
  • AESTUVER cable ducts
  • fermacell Powerpanel HD

For the specifications of the boards and their attestations, please refer to the respective product data sheets here.

AESTUVER fire-protection board

AESTUVER fire-protection board

Cement-bonded, glass-fiber reinforced lightweight concrete board for high-quality structural fire-protection.

  • Reference projects: AESTUVER fire-protection board

    Project Place Year Type of protection / Requirement Area (m²)

    Hauma Railwa Station

    Jerusalem, ISR

    2015

    Protection for ceilings and walls /
    EUREKA/ISO curve

    33,000

    Odenplan Tunnel

    Stockholm, SWE

    2014

    Protection for ceilings and walls /
    EUREKA/ISO curve

    10,000

    Ulmberg tunnel

    Zürich, CHE

    2012

    Protection for ceilings and walls /
    ISO curve

    2,500

    Tegel airport tunnel

    Berlin, DEU

    2008

    Protection of longitudal cable duct in the tunnel wall /
    E 90

    1,900 m

    Flimserstein tunnel

    Flims, CHE

    2007

    Suspension rod protection, suspended tunnel ceiling /
    F 60

    100 m

    Guadarama tunnel

    ESP

    2006

    Protection for the tunnel gates /
    T 90

    5,000

    Tiergarten B96

    Berlin, DEU

    2005

    Wall recess protection /
    E 90

    2,500

    Cologne-Deutz / Messe Railway Station

    Cologne, DEU

    2004

    Protectio for ceilings and columns /
    EUREKA/ISO curve

    1,200

AESTUVER T fire-protection board

AESTUVER T fire-protection board

Cement-bonded, glass-fiber reinforced lightweight concrete board to protect concrete structures in underground transport systems against higher thermal stress.

  • Reference projects: AESTUVER T fire-protection board

    Project Place Year Type of protection / Requirement Area (m²)

    Konrad Adenauer Tunnel

    Berlin, GER

    2016

    Protection for tunnel ceiling  / ZTV

    4.000

    Marieholm

    Gothenburg, SWE

    2016

    Protection for tunnel ceiling / RWS 180

    18.000

    Roki tunnel

    Roki, RUS

    2014

    Smoke extraction ceiling /
    ISO curve

    86,000

    Danzig tunnel

    Danzig, POL

    2014

    Protection for tubbing segments /
    HC curve

    54,000

    Wagenladungsstraße tunnel (S21)

    Stuttgart, DEU

    2014

    Protection of tunnel wall /
    ZTV curve

    11,000

    Citybanan tunnel

    Stockholm, SWE

    2014

    Smoke extraction layer /
    ISO curve

    10,000

    Odenplan tunnel

    Stockholm, SWE

    2014

    Protection of the tunnel ceiling /
    ISO curve

    7,500

    Avenue2 (De Groene Loper)

    Maastricht, NLD

    2013

    Protection for tunnel ceiling and wall /
    RWS curve

    100,000

    Sochi tunnel

    Sochi, RUS

    2012

    Smoke extraction layer /
    REI 90

    78,000

    Söderleds tunnel

    Stockholm, SWE

    2012

    Protection of the tunnel ceiling /
    RABT curve

    23,000

    Hamina tunnel

    Husula, FIN

    2012

    Protection of the tunnel ceiling /
    HCM curve

    18,500

    Kö-Bogen tunnel

    Düsseldorf, DEU

    2012

    Protection of the tunnel ceiling and wall

    11,500

    Hämeenlinnan tunnel

    Hämeenlinna, FIN

    2012

    Protection of the tunnel ceiling and wall /
    HCM curve

    11,500

    Landy tunnel

    Paris, FRA

    2011

    Protection of the tunnel ceiling and wall /
    ISO curve & HCM curve (N1 - N3 category according CETU guideline)

    38,000

    Porte de Pantin

    Paris, FRA

    2011

    Protection of the tunnel ceiling and wall /
    ISO curve & HCM curve (N3 category according CETU guideline)

    30,000

    Champigny tunnel

    Paris, FRA

    2011

    Protection of the tunnel ceiling and wall /
    ISO curve & HCM curve (N3 category according CETU guideline)

    20,400

    2nd tube Elbe tunnel Hamburg

    Hamburg, DEU

    2010

    Upgrading fire-protection in the tunnel with coated 20 mm and 10 mm all-over bakcing layer; smoke-removal duct with 20 mm /
    ZTV curve

    40,000

    1st to 3rd tube Elbe tunnel Hamburg

    Hamburg, DEU

    2009

    Protection of the suspended ceiling and the wall /
    ZTV curve

    120,000

AESTUVER Tx fire-protection board

AESTUVER Tx fire-protection board

Cement-bonded, glass-fiber reinforced lightweight concrete board to protect concrete structures in underground transport systems against higher thermal stress.

  • Areas of application: For independently fixed tunnel cladding in new construction projects as well as existing structures
  • Reference projects: AESTUVER Tx fire-protection boards

    Project Place Year Type of protection / Requirement Area (m²)

    Keilaniemi, Tunnel Espoo

    Espoo, FIN

    2018

    Ceiling cladding and wall lining / HCM 120

    30.000

    E18 Ekeberg and Svardtals

    Oslo, NOR

    2017

    Ceiling cladding and wall lining / HC 120

    5.500

    S16 Dalaaser Tunnel

    Dalaas, AUS

    2017

    Ceiling cladding and wall lining / HCM 120

    9.000

    Wiltener Tunnel

    Innsbruck, AUS

    2017

    Ceiling cladding and wall lining / RWS 120

    18.000

    Granfoss

    Oslo, NOR

    2016

    Protection of the tunnel ceiling / HC 120

    8.000

    Tunnel Hirschstetten (A 23)

    Vienna, AUT

    2016

    Ceiling cladding and wall lining

    HCM-Curve

    Granfoss Tunnel

    Oslo, NOR

    2016

    Ceiling cladding / HC-Curve 120

    -

    Tunnel airport Abu Dhabi

    Abu Dhabi, UAE

    2016

    Ceiling cladding / RWS-Curve 120

    -

    Tamperen tunnel

    Tamperen, FIN

    2015

    Protection of the tunnel ceiling /
    HCM 120

    5.000

    Bergisel tunnel

    Innsbruck, AUT

    2015

    Protection for tubbing segments / HCM 180

    22.500

AESTUVER D+2 Fire-protection elements

AESTUVER D+2 Fire-protection elements

Cement-bonded, glass-fiber reinforced lightweight concrete board for escape and rescue routes.

  • Reference projects: AESTUVER D+2 Fire-protection elements

    Project Place Year Type of protection / Requirement Area (m²)

    Cologne underground (new line "Nord-Süd Stadtbahn")

    Cologne, DEU

    2015

    Trough cover in the tunnel and at the ramps /
    A1 board

    2,400

    Public transportation services Duisburg, Essen, Mülheim a.d.R.
    "VIA Verkehrsunternehmen"

    Duisburg, Essen, Mülheim a.d.R., DEU

    2015

    Trough cover in the tunnel & at the ramps and outside with partialy anti-slip finish R13 /
    A1 board

    1,750

    Frankfurt am Main underground

    Frankfurt am Main, DEU

    2012

    Track-crossing with anti-slip finish R13 /
    A1 board

    Highway A40

    Essen, DEU

    2012

    Cable duct cover /
    A1 board

    Munich underground station "Implerstrasse"

    Munich, DEU

    2010

    Escape way with anti-slip finish R13 /
    A1 board

    250

    Munich underground station "Moosacher Bahnhof"

    Munich, DEU

    2010

    Track-crossing with anti-slip finish R13 /
    A1 board

    50 m²

    Cologne underground

    Cologne, DEU

    2008

    Rehabilitation of the ramps /
    A1 board

    3,000

    Deutzer bridge

    Cologne, DEU

    2007

    Cable duct cover with anti-slip finish R13 /
    A1 board

    1,800

    Cologne underground

    Cologne, DEU

    2006

    Trough cover /
    A1 board

    3,500

    Berlin underground

    Berlin, DEU

    2004

    Escape route between rails /
    A1 board

    1,750

    Rail crossing Nürnberg Fürth

    Nuremberg, DEU

    2003

    Escape route/crossing /
    A1 board

    100

    Munich underground

    Munich, DEU

    2002

    Trough cover /
    A1 board

    200

AESTUVER cable ducts

AESTUVER fire-protection cable duct

For electrical installations fermacell AESTUVER offers a complete system with ready-to-install cable ducts with different fire-resistance ratings. The duct elements are pre-fabricated from water- and frost-resistant AESTUVER fire-protection board material. The board material has a hard, smooth and abrasion-resistant surface.

  • Reference projects: AESTUVER cable ducts

    Project Place Year Type of protection / Requirement Length (m)

    S 10 Mühlviertler highway

    Unterweitersdorf - Freistadt Nord, CHE

    2015

    Cable duct /
    E 90

    400

    Elb tunnel tube

    Hamburg, DEU

    2011

    Cable duct /
    E 90 and ISO

    3,500

    Munich underground station "Münchener Freiheit"

    Munich, DEU

    2010

    Cable ducts /
    E 30 and I 30

    650

    The Berliner Verkehrsbetriebe (BVG)

    Berlin, DEU

    2009

    Cable ducts

    5,800

    2nd Elbe tunnel tube

    Hamburg, DEU

    2009

    Cable ducts /
    E 90

    1,100

    Central station Lehrter Bahnhof

    Berlin, DEU

    2004

    Cable ducts /
    E 30 and I 30

    7,500

    North-south rail link

    Berlin, DEU

    2005

    Cable ducts /
    E 90

    7,000

    Regional station Potsdamer Platz

    Berlin, DEU

    2005

    Cable ducts /
    E 30 and I 30

    2,000

    Moorfleet tunnel

    Hamburg, DEU

    2003

    Cable duct /
    ZTV-ING

    2,100

    Heiligenberg tunnel

    Kaiserslautern, DEU

    2002

    Walk-on cable duct /
    E 90

    3,000

fermacell Powerpanel HD

fermacell Powerpanel HD

The cement-bonded construction panels with exceptional resistance for both inside and outside.

  • Reference projects: fermacell Powerpanel HD

    Project Place Year Type of protection / Requirement Area (m²)

    Citibanan / Odenplan

    Stockholm, SWE

    2014

    Protection of walls and columns /
    A1 board, water-resistant

    5,600

    Tunnel Wagenladungsstraße (S21)

    Stuttgart, DEU

    2013

    Wall and ceiling lining (design) on metall substructure with insulation /
    A1 board, water-resistant

    10,500

    Branichtunnel

    Schriersheim, DEU

    2013

    Panel for working joints /
    Design requirements

    400

    Railway tunnel Münster - Wiesing

    Brixlegg, AUT

    2009

    Water-/frost-resistant joint partition panel in the concrete base /
    Water- and frost-resistant

    1,600

    Sol Residence

    Estoril, PRT

    2009

    Outside fire-protection apron in the window area /
    REI 60 

    2,200

    Fehlberttauerntunnel

    Innsbruck, AUT

    2009

    Wall linings in the portal area and cutouts /
    Design and water-/frost-resistant

    500

    NSBP Tunnel

    Brisbane, AUS

    2008

    Wall lining with PU coat /
    A1 board

    47,000

    Wienerwaldtunnel

    Chorherrn, AUT

    2008

    Predetermined breaking line for ballastless rail, increasing of the casting areas /
    A1 board

    3,000

    Wienerwaldtunnel

    Chorherrn, AUT

    2008

    Water-/frost-resistant joint partition panel in the concrete base /
    Water-/frost-restistant

    2,700

    Blessberg tunnel

    Schalkau, DEU

    2009

    Water-/frost-resistant joint partition panel in the concrete base /
    Water resistant

    1,200